Warning: Undefined variable $id in /var/www/html/wp-content/themes/kirby/functions.php on line 1803

Pilot valve, EVM NC

027B1120

Product Description

Danfoss EVM Pilot Valve

EVM is a solenoid pilot valve for use when on/off operation of the PM main valve is required. EVM valves are intended for use with Danfoss solenoid valve coils.
Together with CVH, an EVM can also be used as an independent solenoid valve.

Characteristics: 

  • Type:  EVM (NC) / Solenoid valve 
  • Weight:  0.252 Kg 
  • 10W a.c. MOPD bar:  21 bar 
  • 14W a.c. MOPD psi:  300 psi 
  • 20W d.c. MOPD bar:  14 bar 
  • Ambient temperature:  Max. +80 °C 
  • Armature tube size:  13,5 MM 
  • Coil type:  VAC 10 Watt VDC 20Watt 
  • Cv-value USgal/min:  0,324 
  • Cv-value USgal/min:  0.43 gal/min 
  • Description:  Normally closed 
  • Direction:  None 
  • Fluid Group:  1 
  • Function:  NC 
  • Housing material:  STEEL 
  • Inlet type:  M24x1,5-6g 
  • Kv-value m³/h:  0,280 
  • Kv-value m³/h:  0.37 m³/h 
  • Manual Operation:  No 
  • Max. Working Pressure bar:  35 bar 
  • Max. Working Pressure ef:  45,2 bar 
  • Max. Working Pressure:  508 psig 
  • Max. Working Pressure:  655 psig 
  • Medium temperature range °C:  -60 - 120 °C 
  • Medium temperature range °F:  -76 - 248 °F 
  • Orifice size:  3,30 
  • Pack size:  1 
  • Pressure range bar  MOPD: 21 bar 
  • Pressure range psig  MOPD: 305 psig 
  • Refrigerant(s):  CFC 
  • Refrigerant(s):  HCFC 
  • Refrigerant(s):  HFC 
  • Refrigerant(s):  R717 
  • Standard product:  Yes 
  • Type designation:  EVM (NC) 
  • Type designation:  Solenoid valve

Resources

Pilot valve, type CVP, CVPP, CVC, CVE, EVM and CVH

Pilot valve, type CVP, CVPP, CVC, CVE, EVM and CVH

0 bytesPDF